
33012 was new to traffic in July 1960. Since entry to the Works on 4th January 2021, it has received significant attention.
Information and pictures of motive power and rolling stock produced in the British Railways era

The plan was for the majority of the vehicle modifications to take place away from operational depots, permitting a production line approach that would not disrupt depot operations. This phase of the modification programme will take place at Arlington Fleet Services at Eastleigh, Hampshire. Hitachi had previously assessed the time, cost and disruption of using various locations across the UK before selecting the option of setting up two repair lines at Arlington. The programme will address trainsets containing vehicles with cracks first, prioritising those with cracks in the vicinity of the yaw damper. All vehicles, whether cracked or not, will be modified, with the programme expected to be complete in 2028.
The Easter Highlander working is planned for 2 x DRS Class 37 68007, but there now may be a daylight picture opportunity from this area.
The PLPR test train scheduled 1X18 15:13 Salisbury - Salisbury for on Thursday 7th did not run, circumstances not known.
The DRS sale of coaches, some of which have previously been pictured in these pages, in Fife and on the Cumbrian Coast, appears to have been completed, with 57002 making a move from Motherwell on 6th April, then from Kingmoor to Barrow Hill on 7th, onward to Great Yarmouth for Eastern Rail Services.
Outcome believed to be: