Saturday, 13 December 2025

8th - 13th December 2025

 

66536 prepares the stock for 4E65 13:13 Maritime - Doncaster Europort, 11th December.


66594 NYK Spirit of Kyoto 4O14 05:08 Garston - Maritime, arriving at Maritime, 11th December.


59202 Pride of Ferrybridge at Eastleigh with 6O68 09:11 Westbury Tarmac - Crawley, 12th December.


20205 + 395008 + 20007 passing St Denys, 12th December. Video clip by Ian Knight.

Monday 8th December: 47727 0O47 12:50 Leicester- Eastleigh one
Tuesday 9th December: 47739 (+ 701038) 5Q84 11:00 Marchwood - Wimbledon Park; 47739 0Z85 15:17 Wimbledon - Eastleigh; 71000 + 57311 + 1Z71 0729 London Victoria - Havant - Eastleigh - Salisbury - Bath Spa one two three four five six, 57311 + 47593 (one two)1Z72 17:56 Bath Spa - Salisbury - Eastleigh - Havant Victoria
Wednesday 10th December: 47727 0F94 09:47 Eastleigh - Leicester
Thursday 11th December: 20007 + 20205 T+T 5O27 06:20 Wembley - Eastern Docks one47739 0Z84 09:12 Eastleigh - Marchwood, 47739 (+ 701032) 5Q84 11:00 Marchwood - Wimbledon Park ("This service was cancelled due to a problem with the traction equipment (MC)."); 67027 + 66544 0Z27 09:05 Westbury - Didcot - Eastleigh Arlington one two
Friday 12th December: 20205  (+ 395008) + 20007 7Q28 10:30 Eastern Docks - Eastleigh Arlington one two three four, 20205 + 20007  5M29 14:00 Eastleigh - Wembley; 61306 + 47593 T+T 1Z71 08:00 Three Bridges - Bath Spa one two, 61306 + 71000 + 47593 1Z72 15:55 Bath Spa - Three Bridges one two three four five
Saturday 13th December: 34028 + 47802 1Z87 07:18 Three Bridges - Bristol one two, 1Z88 17:17 Bristol - Three Bridges (34028 5Z89 19:28 Salisbury - Swanage)

Freightliner Agree Deal with Porterbrook for 150 Intermodal Wagons - "a new design based on 40ft platforms" - so not quite an extension of the FFA-G type.

Engine problems hit GWR IET fleet with root cause not yet identified - fuel pumps are failing.

70009 has been returned from Colas to Freightliner pool DFHH, currently at Midland Road, Leeds.